English

ZDS-MR5008

ZDS-MR5008 Super Metal Repair Compound

ZDS-MR5008 repairs and rebuilds damaged areas on industrial metal equipment. Its paste form and high bonding strength support shaped repairs on prepared surfaces.

Product overview

Metal repair and rebuilding compound

ZDS-MR5008 repairs and rebuilds damaged areas on industrial metal equipment such as pumps, valves, flanges and pipelines. It is a paste designed for placement and shaping on the repair area.

High mechanical and bonding strength helps the compound adhere to prepared industrial surfaces. Multi-substrate compatibility matters when a repair includes different metal components, so the actual contact materials and surface condition should match the job.

Key material properties

  • Mechanical and bonding strength: Compare the material strength values with the requirements of the application.
  • Substrate compatibility: Match the actual contact material to the intended application.
  • Adhesion to prepared surfaces: Surface condition and preparation are important to the bond.

Evaluate the material

ZDS-MR5008 technical specifications

PropertyValue / conditions
Product modelZDS-MR5008
Product seriesZDS-MetalRebuild
Product familyMetal rebuilding & cold repair
Substrates and equipmentPumps and pump casings, valves, flanges, industrial pipelines, metal components
Form and colorPaste; Typical: Grey
Working time at 25°CTypical: 30-45 min
Initial cure at 25°CTypical: 4-6 h
Full cure / cure conditions24 h at 25°C
Service temperatureTypical: -40°C to +120°C
Recommended application temperatureRecommended: 10°C to 35°C
Recommended application thicknessRecommended: 1-5 mm

Questions about your operating conditions?

Repair and rebuilding applications

Restore worn metal equipment areas

ZDS-MR5008 is used to repair and rebuild damaged areas on pumps, pump casings, valves, flanges, industrial pipelines and other metal components. Its paste form supports shaping the compound to the repair area, while its high mechanical and bonding strength suits repairs that need a firm material bond.

Match the repair to the component and access

Choose this compound when the repair involves compatible industrial substrates and the damaged area can be reached for surface preparation and shaping. Repair dimensions, the required finished shape and available access help determine whether the product fits the job and how much material is needed.

Grey repair compound shaped on a damaged metal pump casing beside hand tools and protective gloves.
Industrial valve and flange components arranged with grey repair compound and measuring tools on a workbench.

Prepare the work surface

Prepare the repair area using the product-specific preparation instructions.

  1. Inspect the damaged area and the surrounding component for loose material and contamination.
  2. Arrange access to the full work area and the tools needed for the next step.
  3. Address contamination using the preparation method specified for this product and the actual surface.
A damaged metal pump casing inspected on a clean workbench with surface-preparation tools and protective gloves.

Plan the work

Application and cure planning

  1. Prepare the repair area and arrange access and tools before starting.
  2. Mix the components according to the product instructions after surface preparation and setup are complete.
  3. Place and shape the repair material according to the product instructions.
  4. Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.

Product selection questions

How much working time is available?

The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.

What is the full-cure schedule?

Full cure: 24 h at 25°C. Follow the product instructions for the applicable cure conditions.

What temperatures apply?

Recommended application temperature: 10°C to 35°C. Service temperature: Typical: -40°C to +120°C. Application and service temperatures describe different conditions.

What thickness is recommended?

Recommended: 1-5 mm. Use the stated thickness type and range when planning the work.

Scroll to Top
ZDSCHEM
TECHNICAL & COMMERCIAL SUPPORT

Tell us what you need to repair.

Share the equipment, substrate, damage and operating conditions. Our team will review the right product family and next step.

  • 01Application reviewProduct direction based on real service conditions
  • 02Samples & validationSupport before bulk procurement
  • 03Global B2B supplyDocumentation, packaging and export coordination

What helps us respond faster
Photos · temperature · pressure · chemical medium · required quantity

Get Technical Support

By submitting an enquiry, you agree that ZDSChem may use the information to assess and respond to your request. View our Privacy Policy.