English

ZDS-MR5004

ZDS-MR5004 Aluminum Repair Compound

ZDS-MR5004 repairs and rebuilds flanges, pipe fittings, and metal components. It adheres to prepared surfaces and can be machined after cure.

Product overview

Aluminum repair compound for metal rebuilding

ZDS-MR5004 is a paste compound for repairing and rebuilding flanges, pipe fittings, and metal components. It is designed for field-applied structural repair on prepared industrial surfaces.

Its adhesion to prepared surfaces supports contact with the repair area, while its machinable-after-cure property matters when the rebuilt section needs finishing. The repair dimensions and available access help determine whether it fits the job.

Key material properties

  • Machinable after cure: Relevant when the rebuilt area needs machining after curing.
  • Adhesion to prepared surfaces: Surface condition and preparation are important to the bond.
  • Field application: Suitable for consideration in a planned on-site repair.

Evaluate the material

ZDS-MR5004 technical specifications

PropertyValue / conditions
Product modelZDS-MR5004
Product seriesZDS-MetalRebuild
Product familyMetal rebuilding & cold repair
Substrates and equipmentFlanges, pipe fittings, metal components
Form and colorPaste; Typical: Metallic grey
Working time at 25°CTypical: 30-45 min
Initial cure at 25°CTypical: 4-6 h
Full cure / cure conditions24 h
Service temperature-60 to 180°C
Recommended application temperatureRecommended: 10°C to 35°C
Recommended application thicknessRecommended: 1-5 mm

Questions about your operating conditions?

Repair and rebuilding applications

Rebuild worn metal components

ZDS-MR5004 is intended for repairing and rebuilding flanges, pipe fittings, and other metal components. Its adhesion to prepared industrial surfaces helps the compound stay in contact with the repair area.

Plan for the finished repair shape

The repair dimensions and access around the component are important selection factors. The compound can be machined after cure when the rebuilt area needs a defined finished shape.

Industrial metal flange with a clean, shaped repair area, isolated on a neutral workshop surface.
Metal pipe fitting repair area beside hand tools and a small shaping tool in an industrial workshop.

Prepare the work surface

Prepare the repair area using the product-specific preparation instructions.

  1. Inspect the damaged area and the surrounding component for loose material and contamination.
  2. Arrange access to the full work area and the tools needed for the next step.
  3. Address contamination using the preparation method specified for this product and the actual surface.
Technician inspecting a metal flange repair area with gloves, safety glasses, and surface-preparation tools.

Plan the work

Application and cure planning

  1. Prepare the repair area and arrange access and tools before starting.
  2. Mix the components according to the product instructions after surface preparation and setup are complete.
  3. Place and shape the repair material according to the product instructions.
  4. Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.

Product selection questions

How much working time is available?

The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.

What is the full-cure schedule?

Full cure: 24 h. Follow the product instructions for the applicable cure conditions.

What temperatures apply?

Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 180°C. Application and service temperatures describe different conditions.

What thickness is recommended?

Recommended: 1-5 mm. Use the stated thickness type and range when planning the work.

Scroll to Top
ZDSCHEM
TECHNICAL & COMMERCIAL SUPPORT

Tell us what you need to repair.

Share the equipment, substrate, damage and operating conditions. Our team will review the right product family and next step.

  • 01Application reviewProduct direction based on real service conditions
  • 02Samples & validationSupport before bulk procurement
  • 03Global B2B supplyDocumentation, packaging and export coordination

What helps us respond faster
Photos · temperature · pressure · chemical medium · required quantity

Get Technical Support

By submitting an enquiry, you agree that ZDSChem may use the information to assess and respond to your request. View our Privacy Policy.