ZDS-MR1346
ZDS-MR1346 Ultra-Temp Cold-Weld Paste
ZDS-MR1346 repairs and rebuilds damaged areas on industrial pipelines. Its thixotropic paste stays where placed during shaping.
Product overview
Industrial Pipeline Repair Paste
ZDS-MR1346 Ultra-Temp Cold-Weld Paste is made for repair and rebuilding on industrial pipelines. It helps restore damaged areas with a paste form that can be placed and shaped during the repair.
Its thixotropic, non-sag consistency helps keep the material in position, while its high-temperature service capability suits pipeline repairs exposed to elevated operating temperatures. Glass transition temperature, or Tg, describes the temperature range where a material changes from a more rigid state toward a softer state.
Key material properties
- Non-sag consistency: Helps the material stay where it is placed.
- Temperature capability: Compare the service-temperature limits in the table with the operating conditions.
Evaluate the material
ZDS-MR1346 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-MR1346 |
| Product series | ZDS-MetalRebuild |
| Product family | Metal rebuilding & cold repair |
| Substrates and equipment | Industrial pipelines |
| Form and color | Paste; Typical: Grey |
| Working time at 25°C | Typical: 5-15 min |
| Full cure / cure conditions | 24 h |
| Service temperature | -40°C ~ +300°C (continuous) |
| Tensile strength | ≥30 MPa |
| Shear strength | ≥22 MPa |
| Glass transition (Tg) | ≥180°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Recommended application thickness | Recommended: 1-5 mm |
Questions about your operating conditions?
Industrial Pipeline Repair
Repair and rebuilding on industrial pipelines
ZDS-MR1346 is a paste for repairing and rebuilding damaged areas on industrial pipelines. Its thixotropic consistency helps the material stay where it is placed while the repair is shaped.
Choose for the repair area and workspace
The damaged area, finished shape, and access around the pipeline affect product selection and repair planning. Check that the work area allows the paste to be placed and shaped as needed.
Prepare the work surface
Prepare the repair area using the product-specific preparation instructions.
- Inspect the damaged area and the surrounding component for loose material and contamination.
- Arrange access to the full work area and the tools needed for the next step.
- Address contamination using the preparation method specified for this product and the actual surface.
Plan the work
Application and cure planning
- Prepare the repair area and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Place and shape the repair material according to the product instructions.
- Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.
Product selection questions
How much working time is available?
The typical working time at 25°C is 5-15 min. Complete surface preparation and setup before mixing.
What is the full-cure schedule?
Full cure: 24 h. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: -40°C ~ +300°C (continuous). Application and service temperatures describe different conditions.
What thickness is recommended?
Recommended: 1-5 mm. Use the stated thickness type and range when planning the work.