ZDS-FG2119
ZDS-FG2119 High-Temperature Nano-Ceramic Adhesive
ZDS-FG2119 bonds, repairs and rebuilds equipment areas on heat exchangers, boilers and industrial pipelines. It offers corrosion resistance and ceramic reinforcement for high-temperature service.
Product overview
High-temperature ceramic adhesive for industrial repair
ZDS-FG2119 is a dark grey adhesive for bonding, repair and rebuilding on heat exchangers, tube sheets, boilers and industrial pipelines.
Its ceramic-reinforced formulation combines corrosion resistance with high-temperature service capability. Select it by matching the equipment conditions to the product limits and checking that the bonding area is accessible for proper preparation and application.
Key material properties
- Corrosion resistance: A selection factor for equipment exposed to corrosive conditions.
- Temperature capability: Compare the service-temperature limits in the table with the operating conditions.
- Ceramic reinforcement: A material feature for the protective application described for this product.
Evaluate the material
ZDS-FG2119 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-FG2119 |
| Product series | ZDS-FluidGlide |
| Product family | High-temperature & chemical service |
| Substrates and equipment | Heat exchangers and tube sheets, boilers, industrial pipelines |
| Form and color | Adhesive; Typical: Dark grey |
| Working time at 25°C | Typical: 30-45 min |
| Initial cure at 25°C | Typical: 4-6 h |
| Full cure / cure conditions | Heat cure required |
| Service temperature | -60 to 800°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Recommended thickness per coat | Recommended: 0.5-1.0 mm / coat |
Questions about your operating conditions?
Industrial bonding and repair applications
Heat exchangers and tube sheets
ZDS-FG2119 is used for bonding, repair and rebuilding on heat exchangers and tube sheets. Its corrosion resistance and ceramic-reinforced material are useful factors where the repair area faces demanding service conditions.
Boilers and industrial pipelines
Use ZDS-FG2119 for bonding and localized rebuilding on boilers and industrial pipelines. The fit depends on the contact area, access for preparation and application, and the equipment’s operating temperature.
Prepare the work surface
Prepare the bonding area using the product-specific preparation instructions.
- Identify the contact surfaces and inspect for loose material and contamination.
- Arrange access to the full work area and the tools needed for the next step.
- Address contamination using the preparation method specified for this product and the actual surface.
Plan the work
Application and cure planning
- Prepare the bonding area and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Apply the adhesive to the prepared contact area according to the product instructions.
- Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.
Product selection questions
How much working time is available?
The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.
What is the full-cure schedule?
Full cure: Heat cure required. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 800°C. Application and service temperatures describe different conditions.
What thickness is recommended?
Recommended: 0.5-1.0 mm / coat. Use the stated thickness type and range when planning the work.