ZDS-FG2116
ZDS-FG2116 High-Temperature Sealing Compound
ZDS-FG2116 seals flange areas on boilers and industrial pipelines. It provides high-temperature service capability and barrier protection against aggressive fluids.
Product overview
High-Temperature Sealing Compound
ZDS-FG2116 is a coating compound for sealing flanges, boilers and industrial pipelines. It helps form a sealing barrier in areas exposed to demanding thermal service.
Its high-temperature service capability and barrier protection against aggressive fluids matter when both heat and fluid exposure affect the sealing area. Review the gap geometry, expected movement and contained fluid when confirming the fit.
Key material properties
- Temperature capability: Compare the service-temperature limits in the table with the operating conditions.
- Barrier protection: The fluid and exposure conditions matter when selecting the protective material.
Evaluate the material
ZDS-FG2116 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-FG2116 |
| Product series | ZDS-FluidGlide |
| Product family | High-temperature & chemical service |
| Substrates and equipment | Flanges, boilers, industrial pipelines |
| Form and color | Coating; Typical: Dark grey |
| Working time at 25°C | Typical: 30-45 min |
| Initial cure at 25°C | Typical: 4-6 h |
| Full cure / cure conditions | 24 h |
| Service temperature | -60 to 350°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Recommended thickness per coat | Recommended: 0.5-1.0 mm / coat |
Questions about your operating conditions?
Sealing Applications
Boiler and pipeline flange sealing
ZDS-FG2116 is used to seal flange areas on boilers and industrial pipelines. Its high-temperature service capability suits sealing work where the equipment operates under demanding thermal conditions.
Selection for fluid and gap conditions
Choose this compound by reviewing the sealing gap, expected movement and contained fluid. Its barrier protection against aggressive fluids can be useful when the sealing area faces demanding fluid exposure.
Prepare the work surface
Prepare the sealing area using the product-specific preparation instructions.
- Inspect the sealing faces or gap for loose material, contamination and access.
- Arrange access to the full work area and the tools needed for the next step.
- Address contamination using the preparation method specified for this product and the actual surface.
Plan the work
Application and cure planning
- Prepare the sealing area and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Apply the sealing material according to the product instructions for the actual joint or gap.
- Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.
Product selection questions
How much working time is available?
The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.
What is the full-cure schedule?
Full cure: 24 h. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 350°C. Application and service temperatures describe different conditions.
What thickness is recommended?
Recommended: 0.5-1.0 mm / coat. Use the stated thickness type and range when planning the work.