English

ZDS-FG1155

ZDS-FG1155 Peel-Resistant Anti-Corrosion Repair Compound

ZDS-FG1155 repairs and rebuilds damaged industrial components. It offers corrosion resistance and compatibility with ceramic, glass-lined and metal surfaces.

Product overview

Anti-Corrosion Repair Compound

ZDS-FG1155 Peel-Resistant Anti-Corrosion Repair Compound is intended for repair and rebuilding.

Application settings include Ceramic and glass-lined equipment, industrial pipelines, metal components. The damaged area and required finished shape determine how much material must be placed and where access is needed.

Key material properties

  • Corrosion resistance: A selection factor for equipment exposed to corrosive conditions.
  • Substrate compatibility: Match the actual contact material to the intended application.
  • Peel resistance: Relevant where forces tend to separate a bond from an edge.

Evaluate the material

ZDS-FG1155 technical specifications

PropertyValue / conditions
Product modelZDS-FG1155
Product seriesZDS-FluidGlide
Product familyHigh-temperature & chemical service
Substrates and equipmentCeramic and glass-lined equipment, industrial pipelines, metal components
Form and colorCoating; Typical: Dark grey
Working time at 25°CTypical: 30-45 min
Initial cure at 25°CTypical: 4-6 h
Full cure / cure conditions24 h
Service temperature-60 to 150°C
Recommended application temperatureRecommended: 10°C to 35°C
Recommended thickness per coatRecommended: 0.5-1.0 mm / coat

Questions about your operating conditions?

Repair Applications

Rebuilding damaged equipment surfaces

ZDS-FG1155 is used to repair and rebuild damaged areas on ceramic and glass-lined equipment, industrial pipelines and metal components. Its corrosion resistance suits equipment exposed to corrosive conditions.

Choosing the right repair fit

Repair dimensions and access help determine whether the compound fits the job. Check that the full repair area can be reached and that the finished shape can be formed as required.

Dark grey repair compound being shaped over a damaged area on a glass-lined industrial component.
Technician examining access around a repaired metal pipeline section with repair tools nearby.

Prepare the work surface

Prepare the repair area using the product-specific preparation instructions.

  1. Inspect the damaged area and the surrounding component for loose material and contamination.
  2. Arrange access to the full work area and the tools needed for the next step.
  3. Address contamination using the preparation method specified for this product and the actual surface.
Technician inspecting a damaged glass-lined component and cleaning the surrounding repair area.

Plan the work

Application and cure planning

  1. Prepare the repair area and arrange access and tools before starting.
  2. Mix the components according to the product instructions after surface preparation and setup are complete.
  3. Place and shape the repair material according to the product instructions.
  4. Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.

Product selection questions

How much working time is available?

The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.

What is the full-cure schedule?

Full cure: 24 h. Follow the product instructions for the applicable cure conditions.

What temperatures apply?

Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 150°C. Application and service temperatures describe different conditions.

What thickness is recommended?

Recommended: 0.5-1.0 mm / coat. Use the stated thickness type and range when planning the work.

Scroll to Top
ZDSCHEM
TECHNICAL & COMMERCIAL SUPPORT

Tell us what you need to repair.

Share the equipment, substrate, damage and operating conditions. Our team will review the right product family and next step.

  • 01Application reviewProduct direction based on real service conditions
  • 02Samples & validationSupport before bulk procurement
  • 03Global B2B supplyDocumentation, packaging and export coordination

What helps us respond faster
Photos · temperature · pressure · chemical medium · required quantity

Get Technical Support

By submitting an enquiry, you agree that ZDSChem may use the information to assess and respond to your request. View our Privacy Policy.