Product overview
Pultrusion manufacturing resin
ZDS-CW5013 is a resin for pultrusion manufacturing of reinforced industrial pipeline components. Pultrusion is a continuous process that draws reinforcement through resin and forming equipment.
Its low viscosity helps the resin wet the reinforcement fibres efficiently. Its mechanical and bonding strength supports the requirements set by the reinforcement design and production process.
Key material properties
- Fibre wet-out: Low viscosity helps the resin wet the reinforcement fibres.
- Mechanical and bonding strength: Compare the material strength values with the requirements of the application.
Evaluate the material
ZDS-CW5013 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-CW5013 |
| Product series | ZDS-CompositeWrap |
| Product family | Pipe reinforcement & FRP repair |
| Substrates and equipment | Industrial pipelines |
| Form and color | Resin; Typical: Amber to translucent |
| Initial cure at 25°C | Typical: 15-30 min |
| Full cure / cure conditions | 120°C × 3 min |
| Service temperature | -40°C ~ +130°C (continuous) |
| Tensile strength | ≥75 MPa |
| Flexural strength | ≥100 MPa |
| Glass transition (Tg) | 126°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Application guidance | Recommended: Per reinforcement design |
Questions about your operating conditions?
Pultrusion manufacturing applications
Reinforced industrial pipeline components
ZDS-CW5013 is a manufacturing resin for pultrusion processes that produce reinforced industrial pipeline components. Its low viscosity helps wet reinforcement fibres during production, while its mechanical and bonding strength supports the composite material design.
Fit with reinforcement and tooling
Select this resin with the reinforcement, tooling, and production cure schedule in mind. The best fit depends on how these process inputs work together and on the target conditions for the finished composite.
Prepare the work surface
Prepare the process materials and tooling using the product-specific preparation instructions.
- Review the reinforcement and tooling preparation required by the production process.
- Arrange access to the full work area and the tools needed for the next step.
- Arrange the reinforcement and tooling to follow the product-specific processing requirements.
Plan the work
Application and cure planning
- Prepare the process materials and tooling and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Use the resin in the intended manufacturing process according to its processing instructions.
- Follow the processing instructions for cure and the production procedure for handling the finished material.
Product selection questions
What is the full-cure schedule?
Full cure: 120°C × 3 min. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: -40°C ~ +130°C (continuous). Application and service temperatures describe different conditions.
Where is this product used?