ZDS-CA1830
ZDS-CA1830 Hydraulic Cylinder Repair Compound
ZDS-CA1830 repairs and rebuilds worn shafts, bearing seats, machine surfaces, and industrial pipelines. Its ceramic-filled formulation provides wear and erosion protection.
Product overview
Hydraulic cylinder repair compound
ZDS-CA1830 is a paste compound for repairing and rebuilding worn shafts, bearing seats, machine surfaces, and industrial pipelines. It helps restore repair areas that need a durable barrier against wear, erosion, or abrasion.
Its ceramic-filled formulation is suited to severe service where surface wear is a concern. Select it by matching the damage, required finished shape, access, and operating temperature to the repair.
Key material properties
- Wear resistance: A useful property when selecting material for worn industrial surfaces.
- Ceramic-filled material: A protective material option for the equipment and exposure described for this product.
- Erosion and abrasion protection: Match the protective layer to the wear mechanism at the component.
Evaluate the material
ZDS-CA1830 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-CA1830 |
| Product series | ZDS-CeramicArmor |
| Product family | Wear & erosion protection |
| Substrates and equipment | Shafts, bearing seats and machine surfaces, industrial pipelines |
| Form and color | Paste; Typical: Dark grey |
| Working time at 25°C | Typical: 30-45 min |
| Initial cure at 25°C | Typical: 4-6 h |
| Full cure / cure conditions | 24 h |
| Service temperature | -60 to 180°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Recommended application thickness | Recommended: 3-10 mm |
Questions about your operating conditions?
Repair applications
Worn shafts and bearing seats
Use ZDS-CA1830 to repair and rebuild worn shafts, bearing seats, and other machine surfaces. Its wear-resistant, ceramic-filled material suits repair areas exposed to abrasion or erosion. Check the damaged area, required finished shape, and available access before selecting the material.
Industrial pipeline wear areas
Use the compound for repair and rebuilding on industrial pipeline surfaces affected by erosion or abrasion. The practical fit depends on the wear mechanism, the size of the repair area, and whether the full surface can be reached for preparation and placement.
Prepare the work surface
Prepare the repair area using the product-specific preparation instructions.
- Inspect the damaged area and the surrounding component for loose material and contamination.
- Arrange access to the full work area and the tools needed for the next step.
- Address contamination using the preparation method specified for this product and the actual surface.
Plan the work
Application and cure planning
- Prepare the repair area and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Place and shape the repair material according to the product instructions.
- Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.
Product selection questions
How much working time is available?
The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.
What is the full-cure schedule?
Full cure: 24 h. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 180°C. Application and service temperatures describe different conditions.
What thickness is recommended?
Recommended: 3-10 mm. Use the stated thickness type and range when planning the work.