ZDS-CA1842
ZDS-CA1842 Rapid-Cure Coarse-Particle Wear Protection Compound
ZDS-CA1842 protects industrial equipment surfaces from severe wear. Its ceramic-filled composition supports coating tasks on pumps, chutes, hoppers and pipelines.
Product overview
Coarse-particle wear protection
ZDS-CA1842 is a paste coating for protecting pump casings, chutes, hoppers, slurry systems, bulk-material systems and industrial pipelines. It is designed for surfaces that face heavy wear in industrial service.
The ceramic-filled material provides a practical protection option where wear resistance matters. Its fit depends on the equipment surface, the area to be coated and the wear or fluid exposure.
Key material properties
- Wear resistance: A useful property when selecting material for worn industrial surfaces.
- Ceramic-filled material: A protective material option for the equipment and exposure described for this product.
Evaluate the material
ZDS-CA1842 technical specifications
| Property | Value / conditions |
|---|---|
| Product model | ZDS-CA1842 |
| Product series | ZDS-CeramicArmor |
| Product family | Wear & erosion protection |
| Substrates and equipment | Pumps and pump casings, chutes and hoppers, slurry and bulk-material systems, industrial pipelines |
| Form and color | Paste; Typical: Dark grey |
| Working time at 25°C | Typical: 5-15 min |
| Full cure / cure conditions | 24 h at 25°C |
| Service temperature | Typical: -40°C to +150°C |
| Recommended application temperature | Recommended: 10°C to 35°C |
| Recommended application thickness | Recommended: 3-10 mm |
Questions about your operating conditions?
Where to use ZDS-CA1842
Protect pump and bulk-material equipment
Use ZDS-CA1842 as a protective coating for pump casings, chutes, hoppers and other slurry or bulk-material equipment. Its high wear resistance and ceramic-filled composition suit surfaces exposed to severe service.
Match the coating to the exposure
Choose this compound when the accessible coating area and the actual wear or fluid exposure call for a protective lining. Review the component, surface condition and coverage area before planning the job.
Prepare the work surface
Prepare the coating area using the product-specific preparation instructions.
- Inspect the coating area for loose material, contamination and the condition of any existing surface layer.
- Arrange access to the full work area and the tools needed for the next step.
- Address contamination using the preparation method specified for this product and the actual surface.
Plan the work
Application and cure planning
- Prepare the coating area and arrange access and tools before starting.
- Mix the components according to the product instructions after surface preparation and setup are complete.
- Apply the coating or lining according to the product instructions and the recommended thickness where given.
- Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.
Product selection questions
How much working time is available?
The typical working time at 25°C is 5-15 min. Complete surface preparation and setup before mixing.
What is the full-cure schedule?
Full cure: 24 h at 25°C. Follow the product instructions for the applicable cure conditions.
What temperatures apply?
Recommended application temperature: 10°C to 35°C. Service temperature: Typical: -40°C to +150°C. Application and service temperatures describe different conditions.
What thickness is recommended?
Recommended: 3-10 mm. Use the stated thickness type and range when planning the work.