English

ZDS-MR5001

ZDS-MR5001 Cast Iron Repair Compound

ZDS-MR5001 repairs and rebuilds damaged pump casings, valves, pipe fittings and other metal components. It adheres to prepared surfaces and can be machined after cure.

Product overview

Cast iron repair compound

ZDS-MR5001 is a paste for field-applied repair and rebuilding of damaged metal components, including pump casings, valves and pipe fittings. It is intended for repair areas where the material must be placed and shaped on the existing component.

Its adhesion to prepared industrial substrates supports attachment to a properly prepared repair surface. Machinability after cure matters when the rebuilt area must be brought to a specific finished shape.

Key material properties

  • Machinable after cure: Relevant when the rebuilt area needs machining after curing.
  • Adhesion to prepared surfaces: Surface condition and preparation are important to the bond.
  • Field application: Suitable for consideration in a planned on-site repair.

Evaluate the material

ZDS-MR5001 technical specifications

PropertyValue / conditions
Product modelZDS-MR5001
Product seriesZDS-MetalRebuild
Product familyMetal rebuilding & cold repair
Substrates and equipmentPumps and pump casings, valves, pipe fittings, metal components
Form and colorPaste; Grey
Working time at 25°CTypical: 30-45 min
Initial cure at 25°CTypical: 4-6 h
Full cure / cure conditions24 h
Service temperature-60 to 180°C
Recommended application temperatureRecommended: 10°C to 35°C
Recommended application thicknessRecommended: 1-5 mm

Questions about your operating conditions?

Repair and rebuilding applications

Rebuild damaged pump and valve components

ZDS-MR5001 is made for repairing and rebuilding damaged areas on pump casings, valves, pipe fittings and other metal components. Its adhesion to prepared industrial substrates helps the repair material stay attached to a properly prepared surface.

Choose for accessible repairs that need finishing

Consider the damage dimensions and access before selecting this compound. The paste can be shaped in the repair area and machined after cure when the rebuilt section needs a finished form.

Grey repair compound being shaped on a damaged metal pump casing in an industrial workshop.
Metal valve and pipe fitting repair area with grey compound shaped over a damaged section.

Prepare the work surface

Prepare the repair area using the product-specific preparation instructions.

  1. Inspect the damaged area and the surrounding component for loose material and contamination.
  2. Arrange access to the full work area and the tools needed for the next step.
  3. Address contamination using the preparation method specified for this product and the actual surface.
Technician inspecting and preparing a damaged metal pump casing on an industrial workbench.

Plan the work

Application and cure planning

  1. Prepare the repair area and arrange access and tools before starting.
  2. Mix the components according to the product instructions after surface preparation and setup are complete.
  3. Place and shape the repair material according to the product instructions.
  4. Use the technical table to plan the cure stages. Follow the applicable repair or application procedure for handling, loading and return to service.

Product selection questions

How much working time is available?

The typical working time at 25°C is 30-45 min. Complete surface preparation and setup before mixing.

What is the full-cure schedule?

Full cure: 24 h. Follow the product instructions for the applicable cure conditions.

What temperatures apply?

Recommended application temperature: 10°C to 35°C. Service temperature: -60 to 180°C. Application and service temperatures describe different conditions.

What thickness is recommended?

Recommended: 1-5 mm. Use the stated thickness type and range when planning the work.

Scroll to Top
ZDSCHEM
TECHNICAL & COMMERCIAL SUPPORT

Tell us what you need to repair.

Share the equipment, substrate, damage and operating conditions. Our team will review the right product family and next step.

  • 01Application reviewProduct direction based on real service conditions
  • 02Samples & validationSupport before bulk procurement
  • 03Global B2B supplyDocumentation, packaging and export coordination

What helps us respond faster
Photos · temperature · pressure · chemical medium · required quantity

Get Technical Support

By submitting an enquiry, you agree that ZDSChem may use the information to assess and respond to your request. View our Privacy Policy.